The challenge: speed to interconnection without hurting ratepayers or reliability

The opportunity: bring your own flexible capacity. Our system offers low cost, dispatchable capacity that is community friendly, fast to build and meets your grid's needs.

Speed to power

The average wait to interconnect is 5-7 years. By incorporating flexibility, that time can be significantly shortened. Its not just interconnection; the wait for new gas turbines is measured in years. Our system offers maximum load flexibility and can be deployed in under a year.

Benefits

Compact footprint

25 MW per acre. Same density as a gas peaker.

The most power dense energy storage system for flexible load management.

Low Cost

Capital cost on par with gas. More competitive than lithium-ion

Less volatility in operating costs without fuel supply risk. Lowest lifetime operating costs for a flexible capacity solution.

Inherently safe and community friendly.

Non-toxic materials, energy stabilized in its final form, no combustion or thermal runaway risk.

No local emissions, no drain from community water resources, no noise pollution, no hazardous waste from decommissioning.

Load flexibility

Offers the most competitive inconnection profile with maximum load flexibility.

Ramp to full output in less than 10 seconds. Granular dispatchability down to kW level with automated controls. No continuous cycle required. Charge and dischage intermittantly. No rest period between cycles required.

Domestic supply chain

98% carbon materials.

Robust US supply chain for all components. Manufactured in the US.

Every large user of energy needs reliable power faster than the grid can deliver it.